Energy
Abraj Succesfully Completes First Well Stimulation On Block 61
bp today announced the successful completion of the first well stimulation on Block 61 by Abraj Energy Services, marking a significant milestone in its relationship with the Omani well services contractor.
The well, located in the Ghazeer field, also represents one of the largest stimulations completed by Abraj.
bp Oman President Yousuf Al Ojaili commented: “We’re delighted to reach this important milestone with Abraj. This is the first time the company has worked with us on a well stimulation. It’s great to see what can be achieved when working collaboratively and with a commitment to in-country value.”

Abraj stimulation equipment (high-pressure pumps and manifolds that are rigged up to the well)
Abraj was initially awarded 30 per cent of the stimulation scope for Block 61, with the opportunity to potentially increase this based on performance.
Abraj Managing Director Abdullah Al Hady commented: “We’re delighted to have worked with bp to deliver this well stimulation, proving the capability of a local company to perform one of the most complex services in well engineering and in one of the most challenging reservoirs. We’ve been grateful for bp’s continuous support, technical advice and for providing us the opportunity to demonstrate our capabilities.”
The gas in Block 61’s Khazzan and Ghazeer reservoirs is known to be ‘tight’.
This means that the hydrocarbon – gas and condensate – is tightly held within the reservoir formations and will not flow naturally to economic rates without stimulation. To do this, fluids and proppant are pumped into the formation at high pressures and rates which opens the reservoir’s rock – creating a ‘super-highway’ that allows the hydrocarbons to flow.

Abraj stimulation equipment (tanks that hold the water for the frac)
The well was stimulated in late November and started to flow shortly thereafter with productivity better than expected.
Once wells flow, residual chemicals and proppant must be removed before they reach the central processing facility. Historically, hydrocarbons produced during well testing would be flared.
bp Oman has pioneered the green completions concept where hydrocarbons are routed to the production facility instead, reducing greenhouse gas emissions. Since adopting this approach in 2019, 201,000 tonnes of CO2e emissions have been saved – equivalent to removing 44,000 cars from the road for a year.
bp Oman has worked to increase its well construction spend with Omani companies.
This has significantly increased with the Abraj contract and is set to grow further in 2021 with the recent award of a highly challenging well test contract to local company FOS.
-
Leaders Speak2 months agoDhofar International Development and Investment Company: Driving Sustainable Growth and Strategic Synergies in Oman’s Investment Landscape
-
Economy1 month agoMaal Card: What Oman’s New National Payment Card Means for Everyday Users
-
Events2 months agoOER Corporate Excellence Awards 2025 Honours Entities and Innovations in Oman
-
Arts and Culture2 months agoOminvest and Bait Al Zubair Launch “Future Frames” to Empower Youth through Art and AI
-
News1 month agoSheikh Suhail Bahwan, Chairman of Suhail Bahwan Group, Passes Away
-
News2 months agoMs. Noor Saldin, Founder of Modern Generation International School, Wins Woman of the Year 2025; School Honored for Empowering Future Female Leaders
-
Economy1 month agoOman Unveils Official Omani Rial Symbol in Landmark Move to Boost Global Currency Presence
-
News4 weeks agoOIG Appoints New CEO to Lead Its Next Chapter of Excellence
