Aviation
Airbus to Check for Cracks on Emirates, Qantas A380 Wings

(Bloomberg) —
Airbus SE will inspect the wings of its A380 double-decker jets after cracks were found on some planes.
The fissures could reduce the structural integrity of the wings if not repaired, according to the European Union Aviation Safety Agency, which is drafting an airworthiness directive on the issue. Aircraft won’t need to be grounded, with fixes to be made during scheduled overhauls.
Checks will initially affect 25 of the oldest superjumbos in service, including planes at Dubai-based Emirates, Qantas Airways Ltd. of Australia and Singapore Airlines Ltd. Remaining planes must be examined before they’re 15 years old.
A wing-crack debacle seven years ago cost Airbus millions of euros in repair and service costs, only one of the glitches to have plagued the world’s biggest passenger plane. Airbus said in February it would stop making the A380 after failing to build up enough of a backlog to keep production going beyond 2021.
An Airbus spokesman said small cracks had been found on the outer rear wing spars of early-production A380s, and that inspections and repairs can be accomplished at the same time as heavy-maintenance checks. The safety of the fleet is not affected, he said.
Airline Checks
Qantas, which needs inspections on six of its 12 A380s, said checks have already been completed on two aircraft and there were no concerns about structural integrity. Singapore Air, which had 19 A380s at the end of March, said four will need to be checked.
Airlines must use ultrasonic testing methods and, if damage is found, alert Airbus for repair instructions before the next flight, according to the EASA directive. A380s operated by Deutsche Lufthansa AG, Air France and charter carrier Hi Fly are also listed in the first batch requiring the checks.
Airbus traded virtually unchanged at 124.20 euros as of 5:13 p.m. in Paris. The stock has advanced almost 48% this year, valuing the Toulouse, France-based company at 96 billion euros ($108 billion).
–With assistance from Benjamin Katz, Angus Whitley and Kyunghee Park.
-
OER Magazines1 month ago
OER, April 25
-
Alamaliktistaad Magazines1 month ago
Al-Iktisaad, April 25
-
Renewables3 weeks ago
Jindal Renewables and OQ Alternative Energy Sign Joint Development Agreement to Advance Integrated Renewable Power Projects in Oman
-
News2 months ago
Oman Signs Historic Agreement to Establish World’s First Liquid Hydrogen Corridor to Europe
-
Renewables1 month ago
Sembcorp’s 588MW Solar Power Plant In Oman Begins Commercial Operation
-
Banking & Finance2 months ago
How Bank Muscat is Pioneering Digital Solutions to Empower Customers
-
Leaders Speak4 weeks ago
OERLive SPOTLIGHT: Oman Sustainability Week 2025 and Oman Petroleum & Energy Show
-
Banking & Finance1 month ago
How is National Bank of Oman Working Towards Creating a Robust Fintech Ecosystem?
You must be logged in to post a comment Login