Economy
Sohar-A’Dhahirah Water Pipeline Worth RO150M Trial Run Begins
Oman Water and Wastewater Services Company (OWWSC) announced the start of the trial run for its new water pipeline project from the Sohar desalination plant to the Wilayats of the Governorate of A’Dhahirah.
The total cost of the project reached RO 150 million.
Eng. Ibrahim Hamad Al Hasani, the Senior Manager of the project said that the water pipeline is 230kms long and that 15 water tanks were built with a capacity of 451,000 cubic meters in the Wilayats of Sohar, Ibri, and Dhank.
Four pumping stations with a total pumping capacity of 144,000 cubic meters per day were also set up.
The water pipeline is constructed in parallel with the current water pipeline between Sohar and the Governorate of Al Buraimi, which will contribute to providing future water needs.
-
Artificial Intelligence1 month agoTop 5 Interesting Things AI Did This Month – September 2026 Edition
-
Fashion4 weeks agoLuxury Watches That Could Appreciate Over the Next Decade [2026 Auction Buyer Guide]
-
Economy4 weeks agoOER Magazine September Edition 2026
-
Banking & Finance2 months agoThe GCC’s 10 Richest Billionaires: Inside US$253.5 Billion of Wealth
-
Alamaliktistaad Magazines3 weeks agoAlam Al-Iktisaad Magazine September 2026 Edition
-
Banking & Finance1 month agoINVESTIGATION: What If You Bought Apple Stock Every Time You Bought an iPhone?
-
News2 months agoOPEC+ Holds Output Steady for October as Focus Shifts to 2027 Quotas
-
Artificial Intelligence1 month agoWhat the World’s Top 10 Tech CEOs Really Earn



