Economy
Sohar-A’Dhahirah Water Pipeline Worth RO150M Trial Run Begins

Oman Water and Wastewater Services Company (OWWSC) announced the start of the trial run for its new water pipeline project from the Sohar desalination plant to the Wilayats of the Governorate of A’Dhahirah.
The total cost of the project reached RO 150 million.
Eng. Ibrahim Hamad Al Hasani, the Senior Manager of the project said that the water pipeline is 230kms long and that 15 water tanks were built with a capacity of 451,000 cubic meters in the Wilayats of Sohar, Ibri, and Dhank.
Four pumping stations with a total pumping capacity of 144,000 cubic meters per day were also set up.
The water pipeline is constructed in parallel with the current water pipeline between Sohar and the Governorate of Al Buraimi, which will contribute to providing future water needs.
-
News2 months ago
OpenAI Strengthens ChatGPT’s Mental Health Safeguards Ahead of GPT-5 Launch
-
OER Magazines4 weeks ago
Dossier – ToP 25 Personalities 2025
-
Dossier4 weeks ago
Arabic Dossier – ToP 25 Personalities 2025
-
Banking & Finance2 months ago
Strong Performance and Strategic Approach: ahlibank announces Its Financial Results for the First Half of 2025
-
Economy2 months ago
Najla Zuhair Al Jamali Appointed President of bp Oman
-
News1 month ago
xAI Open-Sources Grok 2.5, Signaling Accelerated AI Push
-
News1 month ago
Ooredoo Wins Silver Stevie® Award for Diversity and Inclusion Excellence
-
Alamaliktistaad Magazines4 weeks ago
Al-iktisaad, August 25