Uncategorized
BP Khazzan project on track for first gas with 50 wells completed
[rev_slider alias=”BP Khazzan”]
BP has reached a significant milestone in the development of the Khazzan gas project with the successful drilling and completion of the 50th well at the large gas field in Block 61. This is the final well targeted for completion enabling first gas to be delivered later this year.
These first 50 wells will enable production of 1.0 billion cubic feet of gas a day (bcf/d) to be achieved from first gas onwards and delivered to the Sultanate of Oman. This will rise to 1.5 bcf/d once the second phase of the Khazzan project is fully up and running in 2020. A total of over 300 wells will be drilled over the estimated lifetime of the Khazzan project.
The Khazzan gas reserves lie at depths of up to five kilometres in narrow bands of extremely hard, dense rock. These complex and challenging conditions require specialist cutting and drilling equipment, the drilling of both vertical and horizontal wells, stimulation technologies to free the gas, as well as accuracy and efficiency.
Local Omani businesses have provided rigs, stimulation and drilling support, with BP bringing to bear its advanced seismic, hydraulic fracturing and well design expertise. Omani firms have won drilling contracts valued at 85% of the total spend at Khazzan and 60% of overall well services contracts.
Drilling efficiency has increased significantly in the three years since drilling began with the average time to drill and complete a vertical well reduced by 27%. A record time of 60 days was recently achieved for completion of one well.
-
Dossier1 month agoDossier, 2026
-
OER Magazines1 month agoOER, February 26
-
Banking & Finance1 month agoSohar International and Sohar Islamic Supports Over 100 Families in Al Wusta Governorate Through Its ‘Sohar Al Attaa’ Initiative
-
Banking & Finance1 month agoNational Finance Unveils Exclusive Ramadan Offers on Auto Financing
-
Economy1 month agoMiddle East Tensions Heighten Risks to Strait of Hormuz, Raising Uncertainty for Global Oil Markets
-
Economy1 month agoAnalysis: Oman-India CEPA Opens Path to Deeper Trade Investment and Growth
-
Economy1 month agoANALYSIS: Oil Near Seven-Month Highs Amid US, Iran Tensions
-
Education2 months agoJebel View International School to Launch in Muscat in September 2026 & Now Open to Visit

You must be logged in to post a comment Login